The beams are then transported to the building site. The track is built on site by laying the 2 beams at the defined spacing on support blocks.
Track laid in this way already allows low-speed tram traffic.
Advantages
In addition to the Jacket advantages:

Prefarails® GREEN TRACK
The ladder design enables integration into green spaces.
The principle involves installing a module with openings that connect the lawn and topsoil to the platform, ensuring hygrometric continuity between soil and grass while significantly reducing the need for watering during hot weather.

Advantages
In addition to the Jacket advantages:

For any further information or to discuss your project needs, please email us on SalesUK@sateba.com
Company updates and news from across the industry
Product data sheets, certificates and videos
COMING SOON!
Industry case studies from our portfolio
Opportunities to develop a career with Sateba UK
Gate C for Deliveries and Collections:
scrolled.tarred.quibble
Sateba UK Offices (parking):
over.newsreel.hired
© 2026 Sateba UK Ltd. All rights reserved.